Building construction and infrastructure contractor in Jaipur

[email protected]

5.0 Rated on Google

Building construction

Multi-storey residential structure

Completed

RCC frame, slabs and structural work for a multi storey residential building.

A reinforced concrete framed residential building carried up floor by floor: columns, beams, slabs and staircases, with the shear walls and lift core rising with them.

A multi storey frame is a repeating cycle rather than a single build. Column starters are cast with the slab below, the next lift of shuttering goes up around them, the reinforcement cage is tied and checked, and the pour follows. Each cycle takes about a week per floor once it settles, and the accuracy of the first one is inherited by every floor above it.

Two things are checked before every pour and neither is negotiable. Cover, because a bar sitting too close to the face will corrode and spall it within a few monsoons. And propping, because formwork struck early to free material for the next floor is the commonest cause of a slab that sags for the life of the building.

The services are cast in as the frame goes up. Conduit for the electrical runs, sleeves through beams for plumbing, and the shaft openings for the risers are all formed at slab stage, so nothing has to be cut into finished concrete later.

On site

More photographs from this job.

Taken by our own team on site, not staged.

More work

Other building construction jobs.

Row housing development Completed

Row housing development

Row housing units built out alongside site development.

Type
Building construction
Sector
Private
Commercial building Completed

Commercial building

Structure and finishes for a commercial building.

Type
Building construction
Sector
Private
Girls school at Tijara, Alwar Ongoing

Girls school at Tijara, Alwar

Tijara, Alwar, Rajasthan

Ongoing school building construction at Tijara, Alwar.

Type
Building construction
Sector
Government

Your project