Building construction and infrastructure contractor in Jaipur

[email protected]

5.0 Rated on Google

Service

RCC and civil structure

Foundations, columns, shuttering, reinforcement and slab casting for multi-storey work.

Civil scope runs from excavation and foundations through columns, shuttering and reinforcement to slab casting, with our own supervisor on site through the pour.

How the work runs

  1. Setting out

    Grid lines and levels are marked and checked against the drawing before a single bar is cut. Everything above repeats whatever is set out here, correct or not.

  2. Reinforcement

    Bars are cut and bent to the bar bending schedule, laps staggered, cover blocks tied at spacing, and the cage checked before the shuttering closes it in.

  3. Shuttering and propping

    Formwork is aligned, sealed and propped to carry the wet load. Props stay in for the full period. Striking early to release material is the commonest cause of a sagging slab.

  4. Pour and cure

    Concrete is placed continuously to the planned construction joint, vibrated without segregating, finished, and then cured for the full period. Curing is what turns a mix into strength.

What decides whether it goes well

  • Cover is structural. A bar with too little cover corrodes, spalls the face and takes the slab with it.
  • A construction joint goes where the design puts it, not where the working day ends.
  • Cubes are cast from the same pour they certify, and marked at the time. A cube taken later certifies nothing.

On site

This work on our own jobs.

Photographs from the projects where we did it.

Where we did it

Projects with this scope.

Multi-storey residential structure Completed

Multi-storey residential structure

RCC frame, slabs and structural work for a multi storey residential building.

Type
Building construction
Sector
Private
Slab and deck reinforcement Completed

Slab and deck reinforcement

Shuttering, reinforcement and concrete pour for slab and deck work.

Type
Civil and RCC
Sector
Private
Platform structure over a live railway line Ongoing

Platform structure over a live railway line

Rajasthan

RCC deck and platform structure being cast beside working tracks under overhead electrification.

Type
Railway and infrastructure
Sector
Government

Your project