Multi-storey residential structure
RCC frame, slabs and structural work for a multi storey residential building.
- Type
- Building construction
- Sector
- Private
Service
Foundations, columns, shuttering, reinforcement and slab casting for multi-storey work.
Civil scope runs from excavation and foundations through columns, shuttering and reinforcement to slab casting, with our own supervisor on site through the pour.
Grid lines and levels are marked and checked against the drawing before a single bar is cut. Everything above repeats whatever is set out here, correct or not.
Bars are cut and bent to the bar bending schedule, laps staggered, cover blocks tied at spacing, and the cage checked before the shuttering closes it in.
Formwork is aligned, sealed and propped to carry the wet load. Props stay in for the full period. Striking early to release material is the commonest cause of a sagging slab.
Concrete is placed continuously to the planned construction joint, vibrated without segregating, finished, and then cured for the full period. Curing is what turns a mix into strength.
On site
Photographs from the projects where we did it.
Where we did it
RCC frame, slabs and structural work for a multi storey residential building.
Shuttering, reinforcement and concrete pour for slab and deck work.
Rajasthan
RCC deck and platform structure being cast beside working tracks under overhead electrification.
Your project