Building construction and infrastructure contractor in Jaipur

[email protected]

5.0 Rated on Google

Building construction

Row housing development

Completed

Row housing units built out alongside site development.

Row housing built out as a run of repeating units, with the site development, drainage and boundary work running alongside.

Repetition is the whole method here. One unit is set out, checked and agreed, and every unit after it is built to the same marks. That is what keeps plinth levels, door heights, sill lines and conduit drops consistent down a terrace, and it is why the first unit is worth taking time over.

The services follow the same logic. One circuit arrangement per unit, one board serving it, and the incoming run sized for the whole terrace rather than added to unit by unit. A fault then belongs to a unit rather than to the development.

Site development is not the last thing on the list. Levels, drainage and the surface water route are set while the plant is still on site, because a terrace that hands over with nowhere for the water to go comes back in the first monsoon.

More work

Other building construction jobs.

Multi-storey residential structure Completed

Multi-storey residential structure

RCC frame, slabs and structural work for a multi storey residential building.

Type
Building construction
Sector
Private
Commercial building Completed

Commercial building

Structure and finishes for a commercial building.

Type
Building construction
Sector
Private
Girls school at Tijara, Alwar Ongoing

Girls school at Tijara, Alwar

Tijara, Alwar, Rajasthan

Ongoing school building construction at Tijara, Alwar.

Type
Building construction
Sector
Government

Your project

Discuss your requirements with our team.