Panel rooms, distribution boards, cable routing and internal electrification, installed and tested.

We install low tension distribution from the incoming panel down to the final circuit: panel rooms, distribution boards, cable trays and routing, earthing and internal electrification.

Plumbing and firefighting services are handled alongside the electrical scope where the project is taken as an electrical and plumbing package, so one team is answerable for the services in the building.

How the work runs

  1. Before the frame

    Conduit runs and sleeves are set out on the deck and tied to the reinforcement before the slab is poured. Every riser, every drop and every ceiling point is decided now, because after the pour they can only be cut in.

  2. As the structure rises

    Boards are positioned floor by floor, cable trays fixed to the soffit, and the vertical runs pulled through the shafts as each level is closed.

  3. Once the walls are up

    Wiring is drawn through, points fixed, boards dressed and labelled, and every circuit numbered against the drawing.

  4. Before handover

    Insulation resistance and continuity are tested circuit by circuit, earth resistance is measured, phase rotation checked, and the results recorded against the schedule.

What decides whether it goes well

  • A distribution board belongs where a person can reach it without a ladder and where it can be isolated without crossing somebody else's flat.
  • Cable sizes follow the load and the run length, not the size of the conduit that happens to be there.
  • Neutral and earth stay separate downstream of the main earthing terminal. Combining them later is how a metal enclosure becomes live.

On site

This work on our own jobs.

Photographs from the projects where we did it.

Where we did it

Projects with this scope.

Western Railway Karsaliya Station Completed

Western Railway Karsaliya Station

Vadodara, Gujarat

Completed railway station construction at Karsaliya, Vadodara.

Type
Railway and infrastructure
Sector
Government
Girls school at Tijara, Alwar Ongoing

Girls school at Tijara, Alwar

Tijara, Alwar, Rajasthan

Ongoing school building construction at Tijara, Alwar.

Type
Building construction
Sector
Government