DG sets and power backup

Generator foundations, installation, cabling and changeover for standby power.

Generator sets are installed on cast foundations with the cabling, changeover and exhaust routing done as part of the same scope, so the standby supply is ready to be commissioned with the rest of the electrical work.

How the work runs

  1. Foundation

    The block is cast to the manufacturer's loading, cured, and fitted with anti vibration mounts. A set on an underdesigned base transmits into the structure and is heard on every floor above.

  2. Placement and alignment

    The set is landed, levelled and aligned. Clearance for the radiator air path and for a person to service it is checked at this stage, because neither can be added later.

  3. Connection

    Alternator cables are run to the changeover panel, the earth is taken from the set frame and the neutral, and the exhaust is routed with expansion allowed for and the roof penetration sealed.

  4. Commissioning

    The set is started on no load, then tested against the building's own load with the changeover operated both ways, and the transfer time recorded.

What decides whether it goes well

  • Changeover is where standby power is won or lost. An interlock that can be defeated by hand is not an interlock.
  • Exhaust discharge points away from windows, air intakes and the neighbouring plot, and the elbow is supported so the manifold does not carry the pipe.
  • Fuel bunding is not optional. A leak inside a plant room is a fire, not a spill.