Substation and LT panel installation
Transformer placement, terminations, LT panel room and cable routing.
- Type
- Electrical
- Sector
- Private
Electrical
Generator foundation, placement, cabling and changeover.
A diesel generating set installed as standby power: the foundation cast to the manufacturer's loading, the set landed and levelled on anti vibration mounts, and the cabling run through to the changeover panel.
The foundation is the quiet part of the job. A set on an underdesigned base transmits into the structure and is heard on every floor above it, and there is no fixing that afterwards. The block is cast, cured and fitted with its mounts before the set is delivered.
Placement decides whether the set can ever be serviced. The radiator needs its air path and a person needs room to stand at the filters and the battery. Both are settled while the set can still be moved.
Changeover is where standby power is won or lost. The interlock is mechanical as well as electrical, so the two supplies cannot be paralleled by hand. The exhaust is routed with expansion allowed for, supported so the manifold does not carry the pipe, and discharged away from windows and air intakes. Commissioning is done against the building's own load, with the transfer time recorded both ways.