Substations and transformers

Package substations and transformers, from the plinth and cable trench to HV and LV terminations.

Substation work covers the civil plinth, the transformer placement, cable trenches and the HV and LV terminations, followed by testing before the supply is taken.

How the work runs

  1. Civil first

    The plinth is cast level and to size, with the cable trench and the soak pit formed before anything is delivered. A transformer that arrives before its plinth has cured sits on the ground and blocks the site.

  2. Placement

    The unit is craned or skidded onto the plinth and levelled. Clearances to the walls and to the gate are checked against the drawing, not by eye, because the inspecting authority checks them too.

  3. Terminations

    HV and LV cables are glanded, lugged and torqued. The earthing mat is connected to the tank, the neutral and the fence, each with its own conductor rather than one shared strap.

  4. Charging

    Insulation and ratio checks are made before the supply is taken, then the transformer is charged on no load and the load transferred feeder by feeder.

What decides whether it goes well

  • The earthing mat is the part nobody sees and the part everything depends on. It goes in before the plinth, not after.
  • A substation room needs its ventilation and its escape route as built, not as drawn. Both get checked at inspection.
  • Cable ends are made off in one visit. A joint left open overnight takes in moisture and fails months later.

On site

This work on our own jobs.

Photographs from the projects where we did it.

Where we did it

Projects with this scope.

Residential blocks and site works Ongoing

Residential blocks and site works

Jaipur, Rajasthan

Completed residential blocks with foundations for the next phase under way alongside.

Type
Building construction
Sector
Private

Your project

Tell us the scope and the site.